Powered land for data centers
Compare 61 US powered sites across 20 states: 43 on the market today and 18 closed or contracted land deals to price them against. 45 carry a stated MW figure, each with its basis, from a signed utility agreement to on-site gas. Every cell links its source and shows the date we observed it.

The site register
Stated capacity is a claim, with its basis alongside.
| Caldwell Valley | Between Austin and San Antonio, Texas1 | 4,0001 | Developer campus capacity; site energization target1 | 2,9731 | — | — | Site energization in 20281 | Developer inquiry1 | 2026-11-11 |
|---|---|---|---|---|---|---|---|---|---|
| Virginia Highlands Technology Park | Storey County, Nevada1 | 2,5001 | Developer campus capacity; delivery basis not specified1 | 8,5901 | — | — | — | Developer inquiry1 | 2026-11-11 |
| Hanover Technology Park | Ashland, Hanover County, Virginia1 | 2,4001 | Up to 2,400 MW across 8 substations per developer1 | 1,2111 | — | Dominion Energy1 | — | Developer inquiry1 | 2026-11-11 |
| Buckeye Technology Park | Buckeye, Arizona1 | 1,8001 | Developer campus capacity; delivery basis not specified1 | 2,0191 | — | — | — | Developer inquiry1 | 2026-11-11 |
| Pole Canyon Technology Park | Eagle Mountain, Utah1 | 1,7001 | Developer campus capacity; delivery basis not specified1 | 8441 | — | — | — | Developer inquiry1 | 2026-11-11 |
| Commercial Point Data Campus | Lockbourne, Ohio1 | 1,3001 | Broker claim for campus on-site natural gas turbine generation with hydrogen supplementation1 | — | — | — | — | Sale or lease1 | 2026-11-11 |
| PA1 Findlay / Imperial campus | Findlay Township, Allegheny County, Pennsylvania1 | 1,2401 | Campus plan; up to 600 MW on-site gas and hydrogen generation plus batteries and solar1 | 115.91 | — | — | First capacity Q4 2027 at the earliest, likely Q1 20281 | Sale or lease1 | 2026-11-11 |
| South Valley Technology Park | Storey County, Nevada1 | 1,2151 | Developer campus capacity; site energization target1 | 1,5341 | — | — | Site energization September 2027; construction power stated available in 20251 | Developer inquiry1 | 2026-11-11 |
| Altoona Technology Park | Altoona / Des Moines region, Iowa1 | 1,0001 | Developer capacity supported by utility studies1 | 4681 | — | — | — | Developer inquiry1 | 2026-11-11 |
| Matagorda County powered site (Mara) | Matagorda County, Texas1 | 1,0001 | Grid capacity expected per buyer; up to 2 GW by April 20281 | 1,2001 | — | — | Up to 1 GW by October 20271 | Under contract1 | 2026-11-11 |
| Morris Technology Park | I-80 corridor southwest of Chicago, Illinois1 | 1,0001 | Developer load-ramp target1 | 3441 | — | — | Ramp to 1 GW in 4 years; start date not stated1 | Developer inquiry1 | 2026-11-11 |
| Peru Shelf Technology Park | Storey County, Nevada1 | 8101 | Utility capacity at full buildout, per developer2 | 6861 | — | NV Energy2 | Site energization February 2027; construction power available immediately1 | Developer inquiry1 | 2026-11-11 |
| Applewhite Technology Park | South San Antonio, Texas1 | 7201 | Site-design capacity1 | 3391 | — | — | — | Developer inquiry1 | 2026-11-11 |
| Sapphire Technology Park | Silver Springs, Nevada1 | 7001 | Under utility study1 | 1,0631 | — | — | — | Developer inquiry1 | 2026-11-11 |
| Astra Enterprise Park (Digital Realty) | De Soto, Kansas1 | 6001 | Energy service agreement with Evergy; 2 GW at full delivery1 | 1,4401 | $475,000,0001 | Evergy1 | 600 MW by early 20281 | Sold1 | 2026-11-11 |
| Labadie Powered Land | Labadie, Missouri1 | 5001 | 500+ MW broker headline; power study completed1 | — | — | — | — | Terms on inquiry1 | 2026-11-11 |
| Medina Technology Park | Castroville / San Antonio region, Texas1 | 5001 | Developer campus capacity; site energization target1 | 2651 | — | Medina Electric Cooperative1 | Site energization mid-20281 | Developer inquiry1 | 2026-11-11 |
| Muskogee expansion site (Core Scientific) | Muskogee, Muskogee County, Oklahoma1 | 4401 | Gross power contracted and used under an energy agreement1 | 401 | — | Oklahoma Gas & Electric1 | — | Under contract1 | 2026-11-11 |
| Proximity Park | Ottawa, Kansas1 | 4401 | Broker development headline; utility and delivery basis not stated1 | 2501 | — | — | — | For sale1 | 2026-11-11 |
| North Florida Data Center Site | East Palatka, Florida1 | 4001 | At least 400 MW confirmed by FPL per CBRE; separate 2025 study indicates 1.4 GW offtake1 | 1,3171 | — | Florida Power & Light1 | — | For sale1 | 2026-11-11 |
| West-central Ohio 514-acre assemblage | West-central Ohio1 | 3501 | Committed behind-the-meter gas; grid study resubmitted at 400 MW1 | 5141 | — | — | Gas from 2028-01-01; grid study results expected about Q4 20261 | For sale1 | 2026-11-11 |
| Brazoria County site (CleanSpark) | Brazoria County, Texas1 | 3001 | Transmission facilities extension agreement for 300 MW demand load; potential 600 MW1 | 4471 | — | — | — | Under contract1 | 2026-11-11 |
| Petersburg 93-acre powered parcel | Petersburg area, Virginia1 | 3001 | Executed Dominion letter of agreement for the load; substation design commenced1 | 931 | $69,750,0001 | Dominion Energy1 | — | Sale or lease1 | 2026-11-11 |
| Project Zebulon | El Paso County, Colorado1 | 3001 | Planned behind-the-meter gas bridge power; about 500 MW gas extension, up to 1 GW potential1 | 1,3001 | — | — | Bridge power about Q1 2028; permanent plant about Q1 2029, after entitlement1 | Sale or lease1 | 2026-11-11 |
| Austin County site (CleanSpark) | Austin County, Texas1 | 2851 | Long-term power supply agreements per buyer1 | 2711 | — | — | — | Sold1 | 2026-11-11 |
| Blue Spruce (Aurora) | Aurora, Colorado1 | 2501 | Listing headline; power program under diligence1 | 2,0001 | — | — | — | For sale1 | 2026-11-11 |
| Declo campus (TerraVolt) | Declo, Cassia County, Idaho1 | 2401 | Planned islanded on-site gas generation1 | 1,0771 | — | — | — | For sale1 | 2026-11-11 |
| Peru Ridge Technology Park | Tahoe-Reno Industrial Center, Nevada1 | 2301 | Developer campus capacity; delivery basis not specified1 | 5171 | — | — | — | Developer inquiry1 | 2026-11-11 |
| Project Venus | Venus, Texas1 | 1501 | 150 MW Oncor FEA per broker; further FEAs pending toward 2,400 MW1 | 7001 | — | Oncor1 | — | For sale1 | 2026-11-11 |
| Pony Express Technology Park | Eagle Mountain, Utah1 | 1201 | Developer campus capacity1 | 2251 | — | — | — | Developer inquiry1 | 2026-11-11 |
| Talty campus land (Flexential) | Talty, Kaufman County, Texas1 | 1081 | Planned campus capacity at full build-out (3 × 36 MW)1 | 1101 | — | — | First phase launch late 20281 | Sold1 | 2026-11-11 |
| Del Rio powered land | Near Del Rio, Texas1 | 1001 | Grid power available immediately per listing; transmission studies (not load studies) toward 1.3 GW1 | 11,9501 | — | — | — | Sale or lease1 | 2026-11-11 |
| TekPark campus (TierPoint) | Breinigsville, Pennsylvania1 | 1001 | Power expansion under way; existing data center about 16 MW1 | 1371 | — | — | Expansion due H2 20261 | Sold1 | 2026-11-11 |
| Boulder brownfield campus | Boulder, Colorado1 | 801 | Energized at the substation; 98 MW utility service on site1 | 4641 | — | Xcel Energy1 | Energized today; 500 MW grid-connected by 2030 with a tenant-funded line upgrade1 | Sale or lease1 | 2026-11-11 |
| Yondr Manassas parcel | Manassas, Virginia1 | 721 | Planned campus capacity per buyer1 | 401 | — | — | Operational 2029 per buyer1 | Sold1 | 2026-11-11 |
| 411 Pegasus Parkway (Thor Equities) | LaGrange, Georgia1 | 501 | In-place power output per buyer1 | 2701 | — | — | — | Sold1 | 2026-11-11 |
| Project Rocket | Houston, Texas1 | 501 | CenterPoint-studied capacity per CBRE; 250 MW expansion pathway studied separately1 | 251 | — | CenterPoint Energy1 | Mid-2027 target1 | For sale1 | 2026-11-11 |
| Taylor 20–60 MW site | Taylor, Texas1 | 402 | Listing figure; headline 20 MW scaling to 60 MW1 | 352 | — | — | — | Sale or lease1 | 2026-11-11 |
| Colchester 18 MW fuel-cell site | Colchester, Connecticut1 | 181 | Permitted on-site natural gas fuel cells; power sold under a PPA from $0.15/kWh1 | 171 | — | — | — | Sale or lease1 | 2026-11-11 |
| Hood County powered industrial site | Hood County, Texas1 | 171 | Operational power; reportedly upgradable to 111 MW grid, 311 MW with on-site gas1 | 501 | — | — | — | Under contract1 | 2026-11-11 |
| Georgetown 25 MW site | Georgetown, Texas1 | 132 | Listing figure; headline 25 MW1 | 102 | — | — | — | Sale or lease1 | 2026-11-11 |
| Downtown Dallas 10 MW infill | Dallas, Texas1 | 101 | Secured utility power; additional 30 MW requested1 | 11.51 | — | — | Two near-term 5 MW tranches; 30 MW about 20281 | Sale or lease1 | 2026-11-11 |
| 2100 Spink Street | Atlanta, Georgia1 | — | — | 16.151 | — | — | — | For sale1 | 2026-11-11 |
| 5300 North Canoe Creek Road | Kenansville, Florida1 | — | Initial load study complete; updated study pending in listing; MW not published1 | 2,2321 | — | Duke Energy1 | Early 2028 target using on-site generation and grid power1 | For sale1 | 2026-11-11 |
| 8700 Circle Drive | Rural Hall, North Carolina1 | — | Initial load study funded and underway; no MW published1 | 1431 | — | — | — | For sale1 | 2026-11-11 |
| Apex Industrial Park parcel (Novva) | Apex Industrial Park, near Las Vegas, Nevada1 | — | — | 2051 | $181,000,0001 | — | — | Sold1 | 2026-11-11 |
| Apex Industrial Park parcel (Switch) | Apex Industrial Park, near Las Vegas, Nevada1 | — | — | 1761 | $85,500,0001 | — | — | Sold1 | 2026-11-11 |
| Elk Grove 84 acres | Elk Grove, California1 | — | — | 841 | $12,500,0001 | — | — | For sale1 | 2026-11-11 |
| Goodyear expansion land (Microsoft) | Goodyear, Maricopa County, Arizona1 | — | — | 1001 | $131,000,0001 | — | — | Sold1 | 2026-11-11 |
| Highway 287 — Childress | Childress, Texas1 | — | — | 9501 | — | — | — | For sale1 | 2026-11-11 |
| North Forsyth Industrial Park | Tobaccoville, North Carolina1 | — | — | 3131 | — | Duke Energy1 | — | For sale1 | 2026-11-11 |
| Project Open Sky (Cloverleaf) | Piedmont, Canadian County, Oklahoma1 | — | — | 6331 | — | — | — | Developer inquiry1 | 2026-11-11 |
| Refugee Road parcels (Microsoft) | Pataskala, Licking County, Ohio1 | — | — | 371 | $6,650,0001 | — | — | Sold1 | 2026-11-11 |
| Salem Township assemblage (QTS) | Salem Township, Luzerne County, Pennsylvania1 | — | — | 1,7001 | $586,000,0001 | — | — | Under contract1 | 2026-11-11 |
| South of Dallas — Waxahachie | Unincorporated Waxahachie, Texas1 | — | 138 kV and 345 kV upgrades described as ERCOT approved by broker; no MW allocation1 | 6001 | — | Oncor1 | — | For sale1 | 2026-11-11 |
| State Highway 16 tract (Black Mountain Power) | San Antonio, Bexar County, Texas1 | — | — | 4321 | — | — | — | Sold1 | 2026-11-11 |
| Twin Creeks Assemblage | Leesburg, Loudoun County, Virginia1 | — | — | 971 | $615,050,0001 | — | — | Sold1 | 2026-11-11 |
| Woodward farmland (Microsoft) | Woodward, Dallas County, Iowa1 | — | — | 6161 | $95,500,0001 | — | — | Sold1 | 2026-11-11 |
| STAMP (Science & Technology Advanced Manufacturing Park)2024 brochure | Genesee County, New York1 | 6001 | Substation capacity; substation under construction in 2024 brochure1 | 1,2501 | — | New York Power Authority / National Grid1 | — | Terms on inquiry1 | 2026-11-11 |
| Hencle / Oswego RoadApproval date passed | Baldwinsville, New York1 | 3001 | NYISO interconnection application for 300 MW filed May 2025 by Ranalli Super DC; assignable per broker; no approval published2 | 1242 | $60,000,0001 | — | Listing anticipated approval by April 30, 2026; no approval published as of Nov 11, 20261 | For sale1 | 2026-11-11 |
| 250 Disc Drive2024–25 listings | Longmont, Colorado1 | 51 | Existing supply described as immediately available in 2024 brochure1 | 8.882 | — | — | 2024 brochure: immediate 5 MW; additional 5 MW within six months1 | For lease1 | 2026-11-11 |
Start with your market
Region notes- Western US17 sites
- Central US25 sites
- Eastern US19 sites
- Texas17 sites
- Recent sales18 sites
The MW number needs a second column
Read the methodDesign and studies. A planned campus, a load study and a utility agreement answer different questions. The power-basis field preserves what the source actually says. Compare it before comparing capacity.
Timing and footprint. A listing offered today can have a future power target. Gross acreage can include land outside the buildable footprint. Open the file for both qualifications.
Public evidence, ready to reuse
Field definitionsEach filled field links to its source: the developer’s project page, the broker’s listing or brochure, a county or agency brochure, or the trade-press report of a sale. Every row shows the date we observed it. An empty cell means no source published the value.
Download the CSV or JSON with field-level sources under CC BY 4.0. Send corrections with a public source to hello@poweredlandlist.com.
Questions before you shortlist
What does powered land mean in this tracker?
It means land or a campus marketed for data center development with public power or infrastructure information. The power-basis column records the actual claim. Existing supply, a utility study and a design target represent different stages of readiness.
Are the stated MW figures available IT capacity?
Read each row’s power basis. Figures include developer campus capacity, utility supply claims and planned on-site generation. The tracker preserves these differences instead of adding them into a single capacity total.
Does a listing marked available mean its power is live?
Available describes the marketed property. Power timing is a separate field. A land parcel offered today can carry an energization target several years away.
What should a buyer request before committing?
Request the parcel boundary, usable acreage, executed utility documents, load-ramp schedule, upgrade costs and allocation of those costs. Confirm zoning, water, environmental constraints and transferability of agreements for the specific parcel.
Where are the asking prices?
Asking prices appear when the marketing party publishes one, such as the Petersburg, Virginia parcel at $69.75 million. Most powered sites price on inquiry, so the Recent sales shortlist gives you closed and contracted deals with price, acreage and MW to benchmark against.